Predelivery Inspection

The following checks, adjustments and service jobs were performed prior to delivery of the machine.

[ ] 1. When installing a Yield Monitor and Yield Mapping system, the mobile processor may be loaded with some other software. Refer to "Install and Reprogram GREENSTAR System from Field Documentation or Parallel Tracking to Yield Mapping" Section to reprogram GreenStar from other programs to Yield Mapping [ ] 3. To work with Yield Mapping system, the StarFire position receiver needs to be activated prior to use in order to utilize the improved accuracy. Refer to the installation instruction that comes with the StarFire position receiver bundle.
[ ] 2. Functions of monitor (SETUP) have been checked and are OK. [ ] 4. All the Yield Monitor and Yield Mapping system functions and safety rules have been explained to the operator.

 

Signature Dealer/Service Technician: Date:

 

OUZXMAG,0001227 -19-13OCT01-1/1