Chopper Belt-Replacing

causym CAUTION: Shut off engine, set park brake and remove key.

Remove tension on discharge beater drive belt idler (A). Remove beater belt (B) from chopper drive jackshaft sheave to allow removal of chopper belt.

Release chopper drive belt tension.


A-Drive Belt Idler
B-Beater Belt

H54700

OUO6075,0002864 -19-18MAR03-1/4


Pull arm (A) down, outward and up to release belt tension.

Install rubber strap (B) in slot to hold arm in detensioned belt position.


A-Arm
B-Rubber Strap

H72560
H72540

OUO6075,0002864 -19-18MAR03-2/4


Release latch (A) and lift shield (B) over pins (C).

Remove pin (D) from shield (E) and remove shield from bracket (F).


A-Latch
B-Shield
C-Pins
D-Quick-Lock Pin
E-Shield
F-Bracket

H72013
H71849
H71850

OUO6075,0002864 -19-18MAR03-3/4


Remove belt from sheave (A), idlers (B) and sheave (C).

Install new belt.

Remove rubber strap from arm, and move arm down and into slot to add belt tension.

Adjust belt idler tension spring to the gauge.

Reinstall shields and beater belt. Adjust discharge beater drive belt idler tensioner spring to gauge.


A-Sheave
B-Idlers
C-Sheave

H72024

OUO6075,0002864 -19-18MAR03-4/4