-
CAUTION:

H96927-UN-17JUN10
A - Handle
B - Neutral Position
Concave sections are heavy and awkward to handle. Another
person may be needed to remove and install concave sections.
NOTE: For ease of removal, close concave completely.
Move handle (A) to shift rotor gearcase in neutral position
(B).
-

H96446-UN-20MAY10
A - Separator Covers
Remove shielding as needed to access separator inspection
covers.
-
Remove separator inspection covers (A).
-
Inspect wear on concave sections using AH204933 Clearance Gauge.
-
NOTE:

H96447-UN-20MAY10
A - Cap Screws
B - Separator Grate
Removing separator grate provides access for rotating rotor
for maximum concave to threshing element clearance.
Remove cap screws (A) and separator grate (B).
-

H63543-UN-12APR00
A - Cap Screws
B - Diverter
Loosen cap screws (A) and remove left-hand sheet metal diverter
(B).
-

H63541-UN-12APR00
A - Cardboard
Place a piece of cardboard (A) or poly over conveyor augers.
This provides protection for the augers and allows a smooth surface
to remove the concaves.
-

H96929-UN-17JUN10
A - Separator Cover
Remove shielding as needed to access separator inspection
covers.
-
Remove quick-lock pins and front two separator covers (A) on
right-hand side of machine.
-

H75040-UN-04FEB03
Concave Retainer
A - Spring Pin
B - Concave Retainer
Remove spring lock pin (A) from concave retainer (B).
-
Lift concave retainer and remove handle from each concave section.
-

H63582-UN-14APR00
A - Cap Screws (12 Used)
Loosen cap screws (A).
-
Fully open concave. This allows weight of concaves to rest on
conveyor auger bed.
-

H63583-UN-14APR00
A - Cap Screws (12 Used)
B - Pins
C - ”Z” Bar
Remove cap screws (A).
-
Remove cotter pins, pins (B) and ”Z” bar (C).
-
Rotate rotor such that a gap in the threshing element pattern
occurs at mid concave.
-
Remove center concave section.
-
Slide rear concave to the center position and remove.
-
Slide front concave to the center position and remove.
-
Install concaves in reverse order.
-

H75041-UN-04FEB03
A - Handle
B - Groove
C - Concave Retainer
D - Spring Pin
Install concave handle (A) into groove (B) on concave sections.
-
Install concave retainer (C) and retain with spring pin (D).
-

H63583-UN-14APR00
A - Cap Screws (12 Used)
B - Pins
C - ”Z” Bar
Position ”Z” bar (C) over end of concaves and
install cap screws, but do not tighten.
-
Install pins (B).
-
Fully close concave.
-

H51980-UN-16FEB99
A - Cap Screws
Be sure the ends of concaves fit snug into ”Z”
bar; then tighten top row of cap screws (A) first.
-
Tighten bottom row of cap screws last.
-
Adjust concave level. (See Concave Leveling later in this section.)
-
NOTE:

H96929-UN-17JUN10
A - Separator Covers
Verify that top edge of separator cover is under clips.
Install separator covers (A).
-
Install shielding previously removed to access separator inspection
covers.
-

H96447-UN-20MAY10
A - Cap Screws
B - Separator Grate
Install separator grate (B) and retain with cap screws (A).
-

H63541-UN-12APR00
A - Cardboard
Remove cardboard (A) or poly from conveyor augers.
-

H63543-UN-12APR00
A - Cap Screws
B - Diverter
Install diverter (B) to original position and tighten cap
screws (A).
-

H96446-UN-20MAY10
A - Separator Cover
Install separator inspection covers (A).
-
Install shielding previously removed to access separator inspection
covers.
-
Shift rotor drive gearcase to previous position.