Prepare to Spray

N99943
N99943-UN-20AUG13

A - Quik-Fill Valve


  1. Verify Quik-Fill valve (A) is closed.

  2. N101655
    N101655-UN-11APR13

    A - Pressure Strainer Shut-Off Valve

    Verify strainer shut-off valve (A) is open.



  3. N106855
    N106855-UN-24SEP13

    A - Solution Tank Sump Valve

    B - Tank Rinse Nozzle/EductorValve

    Open solution tank sump valve (A).



  4. Set tank rinse nozzle/eductor valve (B) to Spray position.

  5. N98800
    N98800-UN-17SEP12

    A - Solution Pump Switch

    B - All Boom Sections ON/OFF Switch

    Push solution pump switch (A) to engage solution pump.



  6. Press All Boom Sections ON/OFF switch (B) to engage all spray sections.

CS12167,000077E-19-20150407