Calculate Feedgate Opening

N79290-UN-07DEC07
Equation for English Measurement

N82406-UN-18NOV08
Equation for Metric Measurement
A - Feedgate Opening (in.)
B - Yield in (lb./acre)
C - Spread Width (ft.)
D - Average Speed (mph)
E - Conveyor Shaft Revolutions per Minute (CRPM)
F - Material Weight in (lb./cu. ft.)
G - Theoretical CFR (Conveyor Rate) (cu. ft. per revolution)
H - Feedgate Opening (cm)
I - Yield (kg/ha)
J - Spread Width (m)
K - Average Speed (km/h)
L - Conveyor Shaft Revolutions per Minute (CRPM)
M - Material Weight (kg/m3)
N - Theoretical CFR (Conveyor Rate) (cm3per revolution)
If feedgate opening is not supplied with fertilizer ticket,
use the appropriate equation (English or metric) to calculate correct
opening.
Equations can also be used to calculate conveyor speed required
for a desired application rate and feed gate opening.
NOTE: To verify CRPM, mark conveyor shaft and run spreader in
manual mode with current settings.
|
Theoretical CFR Values
|
|
CFR (metric)1
|
CFR (English)2
|
Conveyor Type
|
Model
|
|
3400
|
0.305
|
Straight Belt
|
Model NL200G4
|
|
2854
|
0.256
|
Belt Over Chain
|
|
3400
|
0.305
|
Straight Belt
|
Model NL300G4
|
|
1605
|
0.144
|
Belt Over Chain
|
MultApplier Box
|
|
1 Based on 1.0 cm feed gate opening
2 Based on 1.0 in. feed gate opening
|
OUO6092,0000959-19-20150310
|
|