Load/Depth Adjustment

LX1030755-UN-27JAN03
A - Load/depth control
B - 1=Depth control
C - 2-4=Mixed control
D - 5=Load control
Before connecting implements to the three-point hitch,
load/depth control (A) must be moved to position “1” (depth control)
to prevent unintentional raising or lowering of the rockshaft.
|
|
OU12401,0000C37-19-20030101
|
|