Park machine safely.
Lower all implements to the ground.
Turn machine off.
Relieve all hydraulic pressure by moving SCV lever rearward-to-forward and side-to-side several times.
Refer to implement operator’s manual for instructions on connecting hydraulic hoses to couplers.
RD47322,0000B14-19-20160815