| AFTER ASSEMBLY |
Lubricate all pivot points and grease fittings. |
| AFTER EACH USE |
Clean backhoe of oil and debris. |
| AS NECESSARY |
Replace bucket teeth. |
| 10 HOURS |
Lubricate swing cylinders head end. |
| |
Lubricate swing cylinders rod end. |
| |
Lubricate swing frame and boom pivot. |
| |
Lubricate boom and dipperstick cylinders and dipperstick pivot. |
| |
Lubricate bucket cylinder, pivot linkage, and bucket pivot. |
| 50 HOURS |
Lubricate stabilizer pivots. |
| |
Check tractor hydraulic fluid level. |
| 100 HOURS |
Clean inside valve covers. |