Operating Machine in the Field
1.
Unfold boom. (See UNFOLDING BOOM in this section.)
|
|
|
AG,OUO1011,249 -19-27APR99-1/6
|
2.
Depress raise/lower switch (A) to position boom at desired operating height.
A-Raise/Lower Switch
|
|
|
AG,OUO1011,249 -19-27APR99-2/6
|
3.
Depress switch (A) to engage solution pump.
4.
If agitation is desired, turn agitation system "ON" using switch (B).
A-Solution Pump Switch
B-Agitation System "ON" Switch
|
|
|
AG,OUO1011,249 -19-27APR99-3/6
|
5.
Press "RUN" button on monitor to view spray operation display on monitor screen.
|
|
|
AG,OUO1011,249 -19-27APR99-4/6
|
6.
Push hydro lever (A) slowly forward to start forward motion.
7.
Press left and/or right solution spray control switches (B) (and center switch-if equipped), to turn individual boom spray sections "ON".
8.
Depress Master ON switch (C) to turn spray system "ON".
A-Hydro Lever
B-Left/Right/Center Spray Control Switches
C-Master Spray Switch
|
|
|
AG,OUO1011,249 -19-27APR99-5/6
|
IMPORTANT:
Spray system shut-down is not immediate. Solution flow will continue for a short period of time (approximately 1-3 seconds) after depressing OFF switch. For best response time and coverage, turn spray OFF as you slow for row end.
9.
At row end, depress right-hand side of Master ON/OFF switch (A) to stop spraying. All other switches can remain in pre-set positions.
IMPORTANT:
Spray system start-up is not immediate. To overcome delayed response, depress ON switch while moving forward to start spraying just before solution is actually needed.
10.
When aligned with next row, depress left-hand side of Master ON/OFF switch (B) to resume spraying.
|
A-Right Hand Side of Master ON/OFF Switch
B-Left-Hand Side of Master ON/OFF Switch
|
|
AG,OUO1011,249 -19-27APR99-6/6
|
|