Operating Job Summaries
Job Summaries keeps track of acres sprayed, volume sprayed, time spent spraying, and the job's start and stop time, for up to six different jobs.
NOTE:
Vol/Acre is calculated on total volume applied by acres covered. If a small percentage of spraying occurs at minimum pressure, Vol/Acre in Job Summaries will typically be slightly higher than the target rate.
To turn a job summary ON or OFF:
1.
Press "INFO".
2.
Press "A" for Sprayer Information.
3.
Press "A" for Job Summaries.
|