Adjusting Booms For Below Horizontal Operation
1.
Unfold boom into operating (spraying) position.
2.
Completely extend level cylinders.
3.
Check that boom sections are parallel to center frame and level to the ground.
4.
Lower booms onto suitable stands at intermediate and outer sections.
5.
Remove pin at base end of cylinder.
6.
Start machine; extend or retract cylinder as needed to locate cylinder to desired position and install pin. Hole (A) (as shown) is for operation of cylinder below horizontal. Hole (B) is nominal position for cylinder.
|