Adjusting Rolling Basket Down Pressure and Transport Clearance

1. If less aggressive rolling basket action is desired or if greater transport clearance is needed, relocate spring end connections to appropriate hole for desired down pressure.

2. Loosen spring end hardware in mounting hole (A) but do not remove at this time.

3. Using depth control hydraulics, lower baskets to ground until spring end hardware is loose (no tension).

4. Remove hardware and activate depth control hydraulics until spring end connections align with desired mounting holes (B-D).

5. Install hardware in holes and tighten to specification.

Specification

Hardware -Torque (109 N·m) 80 lb-ft 

N47734


A-Mounting Hole-Heaviest Down-force
B-Mounting Hole-Heavy Down-force
C-Mounting Hole-Medium Down-force
D-Mounting Hole-Light Down-force

NX,980J97,A35A -19-02APR97-1/1