Positioning Units for Transport
IMPORTANT:
Outer ducts (A) may require that retaining rings (B) be loosened in order to avoid possible interference with upper ducts.
Remove 76 mm (3 in.) hose from nozzle on ladder duct to avoid possible damage to hose before raising units and lowering basket. Retain hose to hydraulic line.
With 4-row 965 and 1016 mm (38 and 40 in.) spacings, units are located properly for transport without repositioning.
Skip row: Move No. 1 unit to 965 mm (38 in.) skip location. Move No. 3 and 4 units to 762 mm (30 in.) location.
All other row spacings: Position units in 762 mm (30 in.) locations.
A-Outer Ducts
B-Retaining Rings
|