Deactivating Inspection Bypass System

1. Release tether switch (A) and place in storage position.

2. Install cover.

3. Move hydro lever (B) to neutral position.

4. Disengage picking unit lever.


A-Tether Switch
B-Hydro Lever

N42165CX
N42177AP

OUO6043,000152B -19-25OCT01-1/1