Lubricate Boom-50 HOURS

N51109

NXH8,64037,J4 -19-15JUL98-1/4


IMPORTANT: Lubrication of the boom should be done at (50 Hours) to ensure maximum boom performance and life.

Lubricate boom hinges. (Left-Hand side shown.)

N55224

NXH8,64037,J4 -19-15JUL98-2/4


Lubricate cable adjusters.

N51111

Cable Adjusters

NXH8,64037,J4 -19-15JUL98-3/4


Lubricate sprocket shaft.

N55081

Sprocket Shaft (Top and Bottom)

NXH8,64037,J4 -19-15JUL98-4/4