Predelivery

After machine has been completely assembled, inspect to be sure it is in good running order before delivering to customer. The following checklist is a reminder of points to inspect. Check off each item as it is found satisfactory or after proper adjustment is made.

[ ] SMV emblem installed; protective shipping tape removed from reflectors and lights are installed.

[ ] All grease fittings have been lubricated. (See LUBRICATION AND MAINTENANCE section in Operator's Manual.)

[ ] Inspect to be sure all nuts have been tightened to proper torque and all cotter pins spread.

[ ] Tires are properly inflated. Tighten wheel bolts to specified torque.

[ ] Make sure High Speed Fertilizer Openers are properly adjusted.

[ ] Warning lights are properly installed and operational.

[ ] Make sure all customer-ordered attachments have been installed or are available for delivery.

[ ] Any parts scratched in shipment have been touched up with paint.

[ ] Remove all shipping decals.

[ ] This machine has been thoroughly checked and to the best of my knowledge is ready for delivery to the customer.

Signed:_________________________

Date:_________________________

OUO6061,0002938 -19-23JAN08-1/1