Attaching Two-Point Hitch to Tractor Without Quick-Coupler

IMPORTANT: Set tractor rockshaft load/depth control (A) in "position" setting. If tractor rockshaft control is set to load sensing, the drill tongue will raise and lower with an increase or decrease of drill draft load. This will result in uneven seed depth as drill is operated across the field.

NOTE: Refer to the tractor operator's manual for specific tractor adjustments.

Set the rockshaft hitch/load depth control (A) for "POSITION SENSING" to prevent unexpected hitch movement.


A-Load/Depth Control

A46758

55-60 Series

A44931

8000 Series

AG,OUO1074,484 -19-22FEB00-1/2


NOTE: Before attaching machine to tractor, be sure hitch pins and spacers are completely assembled to match the hitch configuration of your tractor.

1. Back tractor and align draft links with hitch pins (A).

2. Stop engine and set brakes.

3. Extend draft links and adjust length of lift links to allow installation of hitch pins.

4. Install pins through draft links and retain with quick-lock pins.

5. Raise parking stands (B) and pin in transport position.

N47164


A-Hitch Pins
B-Parking Stands

AG,OUO1074,484 -19-22FEB00-2/2