Preparing Machine Checklist

Perform the following checks to ensure proper initial machine operation.

  1. Standards, coulters, and closing wheels (if equipped) are aligned.

  2. Machine is level side-to-side. (See LEVELING MAIN FRAME—SIDE-TO-SIDE in this section.)

  3. Machine is level front-to-rear. (See LEVELING MAIN FRAME—FRONT-TO-REAR in this section.)

  4. In Field—Check that above steps have been done.

  5. (See Troubleshooting section to correct problems.)

OUO6084,0000468-19-20030514