Every 100 Hours

1. Inspect topper assembly.
2. Inspect base cutter gearbox mounting bolts. If loose, clean bolts and apply Araldite. Tighten bolts to 250 N·m (180 lb-ft).

3. Inspect elevator slat mounting bolts and alignment.
4. Inspect primary extractor fan assembly.
5. Check belt and brushes on the rotary screen.

AG,T803584,98 -19-15MAY06-1/1