|
1.
Inspect topper assembly.
2.
Inspect base cutter gearbox mounting bolts. If loose, clean bolts and apply Araldite. Tighten bolts to 250 N·m (180 lb-ft).
|
3.
Inspect elevator slat mounting bolts and alignment.
4.
Inspect primary extractor fan assembly.
5.
Check belt and brushes on the rotary screen.
|