Pre-Season Checklist

It is recommended that the following checklist is performed before start of every harvest season.
 
Office:
[ ] Print off latest version of pre-harvest checklist from www.stellarsupport.com.
[ ] Download latest GreenStar software (DataCard, KeyCard, and JDOffice) from www.stellarsupport.com and update software on your combine.
[ ] Print off instructions for updating software in combine.
[ ] Print off standard calibration instruction and optional low flow compensation instruction from www.stellarsupport.com. (See combine Operator's Manual for calibration procedures.)
 
JDOffice
[ ] Cleaned up last year's harvest data on PC card.
[ ] Entered all farm and field names.
[ ] Entered all seed varieties for tracking.
[ ] Entered all flags for tracking.
[ ] Saved all setup data to PC card.
 
In Combine
[ ] Review GreenStar system Operator's Manual.
[ ] Adjust contrast button (located in upper right-hand corner of display).
[ ] Adjust backlighting to desired choice on display.
[ ] Zeroed all field and crop totals from last year's harvest.
[ ] If operating a 50, 00, and 10 series combine, set recording height.
[ ] Checked clean grain elevator chain for proper tension. (See combine Operator's Manual for procedures.)
[ ] Checked door at top of clean grain elevator for excessive wear (excessive wear can affect accuracy of recorded data).
[ ] Checked mass flow sensor impact plate for excessive wear (excessive wear can affect accuracy of recorded data).
[ ] Checked receiver for GPS signal (3-D GPS, WAAS, SF1, SF2) in lower left corner of display.
Move combine to open view of sky and turn key to second position, RUN - PAGE 1 screen will appear, if receiver has been stored for longer than 6 months it could take receiver 1 or 2 hours to lock on to a GPS and/or differential signal.
[ ] Verify all setup information is correct for receiver by pressing SETUP/STARFIRE RECEIVER button or SETUP/RECEIVER button. (See GreenStar system Operator's Manual to verify information.)
 
In Field:
[ ] Perform rolling radius test (contact your John Deere dealer).
[ ] Perform a standard calibration procedure.
[ ] Perform low flow compensation procedure.
[ ] Clean impact plate and moisture sensor.
 

 

OUO6050,0000794 -19-09JUN04-1/2


Test, Turn Combine Key to Second Position:
Screen: INFO - DIAG MF
Press: INFO >> HARVEST MONITOR >> DIAGNOSTICS >> MASS FLOW SENSOR.
[ ] Verify Raw Flow and Zero Flow are approximately equal (23,800 ± 1000).
[ ] If Raw Flow and Zero Flow are not approximately equal, contact your John Deere dealer. (See GreenStar Operator's Manual for more information on Raw Flow and Zero Flow.)
 
GreenStar Operation Test:
[ ] Install data storage card in Mobile Processor.
[ ] Turn engine ON, engage separator and header.
[ ] Lower header and drive around an open area.
[ ] Check RUN - PAGE 1 screen to verify recording is ON (you will be creating an actual data file).
[ ] Download data file into JDOffice.
[ ] Verify path of combine while recording is ON and zero yield.
Recorded path of combine should be yellow. Ensure combine stops recording when header is raised.

 

OUO6050,0000794 -19-09JUN04-2/2