|
NOTE:
Energize system is for use on NH3 (not for use on sprayers and liquid fertilizer).
The Energize System procedure is used to test for flow at the openers, purge air and vapor from the NH3 delivery system and fill the cooler and hoses with liquid anhydrous. Upon pressing the start button, the control valve and section valve(s) will be fully opened for three seconds, after which time they will automatically close. The Master Switch can be turned off at any time to
|
immediately force the valves to return to the closed position.
NOTE:
Master switch must be off to enter data.
To begin Energize System test:
1.
Select Energize System from the tests drop-down menu.
2.
Check for bystanders before performing test.
|