GreenStar Diagnostics
Required Items for Documentation
The following items are required for documentation to function:
-
Client, Farm and Field
-
Task
-
Operation
-
Operation Details
-
Product Type/Name
-
Target Rate/Rate Units
-
Recording Source
-
Implement Width/Offsets
-
Controller Setup (when using 3rd-Party controllers)
3rd- controllers are controllers using RS232 connection
(Field Doc Connect) and ISOBUS compliant controllers supporting Task
Controller functionality.
Required Items for Guidance
The following items are required for guidance to function:
-
Tracking mode set to Straight Track, Curve Track, Circle Track
(only available with optional PivotPro module) or Row Finder
-
Track spacing (See equipment section of GreenStar Basics/Pro
General Setup)
-
Track 0 (Except for Curve Track and Row Finder)
-
GPS signal (StarFire signal required)
|
|
OUO6050,000232E-19-20090901
|
|