GreenStar Diagnostics

Required Items for Documentation

The following items are required for documentation to function:

  • Client, Farm and Field
  • Task
  • Operation
  • Operation Details
  • Product Type/Name
  • Target Rate/Rate Units
  • Recording Source
  • Implement Width/Offsets
  • Controller Setup (when using 3rd-Party controllers)

3rd- controllers are controllers using RS232 connection (Field Doc Connect) and ISOBUS compliant controllers supporting Task Controller functionality.

Required Items for Guidance

The following items are required for guidance to function:

  • Tracking mode set to Straight Track, Curve Track, Circle Track (only available with optional PivotPro module) or Row Finder
  • Track spacing (See equipment section of GreenStar Basics/Pro General Setup)
  • Track 0 (Except for Curve Track and Row Finder)
  • GPS signal (StarFire signal required)

OUO6050,000232E-19-20090901