Energize System

PC13151-19-17FEB11
This message will be displayed when the Energize System test
is selected on NH3 systems.

PC12566-UN-13APR10
Energize System Test
A - Tests Drop-Down Menu
B - Master Switch Indicator/Implement Height Switch
Indicator
C - Start Energize System Test Button
D - Override Height Switch Enable/Disable
E - Energize System Status
The Energize System procedure is used to test for flow at
the openers, purge air and vapor from the NH3 delivery system and
fill the cooler and hoses with liquid anhydrous. Upon pressing the
start button, the control valve and section valve(s) will be fully
opened for a few seconds, after which time they will automatically
close. The Master Switch can be turned off at any time to immediately
force the valves to return to the closed position.
NOTE: Turn Master Switch OFF to stop flow immediately.
To begin Energize System test:
-
Select Energize System from the tests drop-down menu.
-
Ensure the area is clear of people, pets, and livestock.
-
Turn vehicle into the wind.
-
Turn the Master Switch ON
-
Override the implement height switch sensor by checking the
override box.
-
Select the Start button. Valves will stay open for a few seconds.
-
Repeat as necessary.
-
Turn Master Switch OFF to stop flow immediately.
NOTE: The override height switch box must be checked each time
the test is run.
|
|
HC94949,00004FA-19-20140501
|
|