Rate Controller Requirements

IMPORTANT: When setting up a GreenStar™ Rate Controller in a system containing multiple GreenStar™ Rate Controllers, ensure setup is applied to the intended controller. Verify controller serial number matches the serial number selected on the display.

NOTE: Turning master switch on or off affects all GreenStar™ Rate Controllers in the system.

Hardware:

  • Foot switch
  • GreenStar™ Rate Controller harnesses
  • GreenStar™ harness
  • Flex box controller
  • Switch box controller (optional)
  • Height Switch
  • StarFire™ Receiver (optional)
  • GS2 1800, GS2 2100, GS2 2600, or GS3 2630 Display

    (For compatibility with GS2 1800 display, reference the GreenStar™ 2 1800 Operator’s Manual.)

Conditions:

  • Complete implement and system setup.
  • Turn on master switch.
  • If switch box is present, assign switch to a section, and turn on switch.
  • If applicable, use Section Control to turn on section. NOTE: Section Control works with pull-behind sprayers, self-propelled sprayers, liquid fertilizer tools, NH3 tools, and planters.
  • Machine speed must be greater than 0.5 km/h (0.3 mph).


GreenStar is a trademark of Deere & Company

StarFire is a trademark of Deere & Company

RW00482,0000446-19-20150107