Charge Tank / Bin

Always check for bystanders before starting the spinner. Failure to do so may cause injury to you or others.

If the tank or bin is not enabled, the Tank / Bin Charge button is grayed out.

  1. PC22709
    PC22709-UN-01JUN16

    Rate Setup Button

    Select the Rate Setup button.



  2. PC22710
    PC22710-UN-01JUN16

    A - Product Drop-Down Menu

    B - Tank / Bin Charge Button

    Select a product from the drop-down menu (A). Control valve assigned to the product must control rate.



  3. Select the Tank / Bin Charge button (B).

  4. PC22711
    PC22711-UN-01JUN16

    PC22712
    PC22712-UN-01JUN16

    A - Product 1 Tank / Bin Charge Button

    B - Product 2 Tank / Bin Charge Button

    C - Product 3 Tank / Bin Charge Button

    D - Product 4 Tank / Bin Charge Button

    E - Accept Button

    Master switch and any assigned RPM meters must be turned on for Tank / Bin charge to operate.

    To operate the conveyor manually, select and hold the Product Tank / Bin Charge button (A—D).



  5. Select the Accept button (E) when finished.

RW00482,00006B5-19-20171213