Every 50 Hours
Check and Tighten Hardware
-

W22472-UN-03MAY12
Mounting Frame and Mast (H120 Loader, Right-Hand
Side Shown)

W23316-UN-13DEC12
Pivot Pins (Pin-On Attachment)

W23317-UN-13DEC12
Pivot Pins (QuikChange Attachment)
A - Hardware, Mounting Frames and Masts
B - Flange Nuts, Pivot Pins
Tighten mounting frame and mast hardware (A), on both sides,
to specification.
| | |
| Mounting Frame and Mast Hardware (A) | Torque | 310 N·m (230 lb·ft) |
-
If equipped with a pin-on
or Quik-Change attachment: Tighten pivot pin flange nuts (B), on both
sides, to specification.
| | |
| Pivot Pin Flange Nut (B) | Torque | 150 N·m (110 lb·ft) |
Check Transmission and Hydraulic Oil Level
-
Cycle all cylinders three
or four times.
-
Retract bucket cylinders
completely and lower the loader to the ground.
-
Shut off engine and remove
ignition key.
-
Check transmission and
hydraulic oil level. (See the tractor Operator’s Manual).
|
|
OUO6064,00017A8-19-20180828
|
|