Backfill

  1. W01147
    W01147-UN-12AUG93

    When backfilling from a large pile, shovel off the top of the pile, pushing toward the excavation. Drag some of the soil back to form a work ramp.



  2. Approach the pile with the bucket level. To determine the amount of material to be pushed, actuate the lift and bucket controls.

OUO6064,0002293-19-20180828