First 10 Hours
□ Lubricate fittings on each side of the loader. (See procedure
in Every 10 Hours in this section.)
□ Tighten the mounting frame hardware on both sides. (See
procedure in Every 50 Hours in this section.)
□ Tighten nuts on pivot pins on both sides of the loader.
(See procedure in Every 50 Hours in this section.)
|
|
OUO6064,00022A4-19-20180828
|
|