First 10 Hours

□ Lubricate fittings on each side of the loader. (See procedure in Every 10 Hours in this section.)

□ Tighten the mounting frame hardware on both sides. (See procedure in Every 50 Hours in this section.)

□ Tighten nuts on pivot pins on both sides of the loader. (See procedure in Every 50 Hours in this section.)

OUO6064,00022A4-19-20180828