First 3 and 10 Hours


First 3 Hours

□  Tighten axle housing and kingpin cap screws. (See procedure in EVERY 50 HOURS in this section.)

□  Tighten mounting frame hardware on both sides. (See procedure in EVERY 50 HOURS in this section.)


First 10 Hours

□  Tighten axle housing and kingpin cap screws. (See procedure in EVERY 50 HOURS in this section.)

□  Lubricate fittings on each side of loader. (See procedure in EVERY 10 HOURS in this section.)

□  Lubricate bucket latch pins (if equipped). (See procedure in EVERY 10 HOURS in this section.)

□  Tighten mounting frame hardware on both sides. (See procedure in EVERY 50 HOURS in this section.)

OUO6038,0001ED4-19-20100726