First 3 and 10 Hours
First 3 Hours
□
Tighten axle housing and kingpin cap screws. (See procedure
in EVERY 50 HOURS in this section.)
□
Tighten mounting frame hardware on both sides. (See procedure
in EVERY 50 HOURS in this section.)
First 10 Hours
□
Tighten axle housing and kingpin cap screws. (See procedure
in EVERY 50 HOURS in this section.)
□
Lubricate fittings on each side of loader. (See procedure in
EVERY 10 HOURS in this section.)
□
Lubricate bucket latch pins (if equipped). (See procedure in
EVERY 10 HOURS in this section.)
□
Tighten mounting frame hardware on both sides. (See procedure
in EVERY 50 HOURS in this section.)
|
|
OUO6038,0001ED4-19-20100726
|
|