First 10 Hours (440R Loader)

□ Lubricate fittings on each side of the loader. (See procedure in Every 10 Hours in this section.)

□ Tighten the mounting frame hardware on both sides. (See procedure in Every 50 Hours in this section.)

□ Tighten the parking stand hardware. (See procedure in Every 10 Hours in this section.)

□ Tighten nuts on pivot pins and front frame on both sides of the loader. (See procedure in Every 50 Hours in this section.)

OUO6064,0001BB3-19-20180829