Backfill
-

W01147-UN-12AUG93
When backfilling from a large pile, shovel off the top of
the pile, pushing toward the excavation. Drag some soil back to form
a work ramp of convenient grade.
-
Approach the pile with
the bucket level. To determine the amount of material to be pushed,
actuate the lift and bucket controls.
|
|
OUO6064,00020F5-19-20180829
|
|