First 10 Hours
□
Lubricate fittings on each side of the loader. (See procedure
in Every 10 Hours in this section.)
□
Tighten pivot pin nuts on both sides of the loader. (See procedure
in Every 50 Hours in this section.)
□
Tighten the mounting frame hardware on both sides. (See procedure
in Every 50 Hours in this section.)
|
|
OUO6064,00019A5-19-20180829
|
|