Backfill
-

W01147-UN-12AUG93
When backfilling from a large pile, shovel off the top of
the pile, pushing toward the excavation. Drag some soil back to form
a work ramp of convenient grade.
-
Approach the pile with a level bucket. Determine the amount
of material to be pushed from the pile by actuating the lift and bucket
controls.
|
OUO6064,000150B-19-20160506
|
|