First 10 Hours

□  Lubricate fittings on each side of the loader. (See procedure in Every 10 Hours in this section.)

□  Tighten pivot pin nuts on both sides of the loader. (See procedure in Every 50 Hours in this section.)

□  Tighten the mounting frame hardware on both sides. (See procedure in Every 50 Hours in this section.)

OUO6064,0002457-19-20180829