2.
Adjust right link to level implement side-to-side.
a.
Lift locking handle (D) and rotate 90° to engage slot (E) onto roll pin (G). Turn locking handle (D):
-
CLOCKWISE to raise draft link.
-
COUNTERCLOCKWISE to lower draft link.
b.
Lift handle (D) and rotate 90° to engage slot (E) onto locking tab (F) of lower body to prevent change of adjustment during operation.
3.
Left lift link is also adjustable in length to accommodate two different length right lift link assemblies used, depending on tire size. The following adjustments will provide optimum hitch leveling:
-
Right lift link, center threaded section measures 316 mm (12-7/16 in.) long:
Adjust the left lift link to 550 mm (21-5/8 in.) from pin-to-pin (lateral float locked out).
-
Right lift link, center threaded section measures 266 mm (10-1/2 in.) long:
Shorten the left lift link to 450 mm (17-7/16 in.).
To change the left lift link length:
a.
Remove upper lift link pin. Rotate the upper end assembly:
-
CLOCKWISE to shorten.
-
COUNTERCLOCKWISE to lengthen.
b.
Install upper pin and locking pin.
|