Level the Hitch

1. Lower implement to take weight off hitch.

IMPORTANT: DO NOT attempt to overextend center link beyond limits of locking clip or lift links past the stops. Link body threads could be damaged.

NOTE: Maximum adjustment range of the center link can only be obtained if the ends are positioned equally within the body when attached to an implement.

2. Adjust center link to level implement front-to-rear. Unlatch locking clip (A). Rotate center link body (B) clockwise to lengthen center link or counterclockwise to shorten it. Be sure to latch the locking clip.

PY6235


A-Locking Clip
B-Center Link Body

SA61034,000020E -19-25SEP08-1/2


3. Adjust right-hand link to level implement side-to-side. Lift locking handle (A) and turn 1/4 turn to engage slot (B) onto roll-pin in the center portion of the lift link.

Turn crank handle (A) clockwise to raise draft link.

Turn crank handle (A) counterclockwise to lower draft link.

After adjustment, lift handle (A) and turn to engage slot (B) onto the lower body to prevent change of adjustment during operation.

4. The left-hand lift link is also adjustable in length to accommodate different tire sizes.

To change the left-hand lift link length, remove the upper lift link pin and rotate the upper end assembly clockwise to shorten or counterclockwise to lengthen, and then reinstall the upper pin and locking pin.

Adjust left and right lift links to accommodate various tire sizes. Set the lift links to have fully-lowered draft link balls approximately seven inches off the ground for greatest range of usable hitch motion.

PY7347

For 5045E, 5055E, 5065E and 5075E Tractors

PY7346

For 5045D and 5055D Tractors


A-Locking Handle
B-Slot

SA61034,000020E -19-25SEP08-2/2