Generator Set (Standby) Power Units
To assure that your engine will deliver efficient standby operation
when needed, start engine and run at rated speed (with 50%—70%
load) for 30 minutes every 2 weeks. DO NOT allow engine to run extended
period of time with no load.
|
|
RG41183,000002F-19-20060727
|
|