Convert Category II Hitch to a Category I (If Equipped)

PY7310
PY7310-UN-29JUN07

Draft Link End

A - Mast Pin

B - Draft Link Bushing

C - Draft Link Ball


Center link end is sized for Category II implement attaching pin.

If Category I implements are to be used, the Category II hitch can be converted as follows:

  1. Insert draft link bushing (B), to the center link end. Smaller implement mast pin (A) is also needed while installing center link bushing.

  2. Rotate draft link ball (C) in draft link ends to fit over implement pins.

NOTE: The image representation is given only for draft link same bushing required to install in the center link.

See nearest John Deere dealer for parts.

SA61034,000020A-19-20200318