Break-In Service
IMPORTANT: Keep wheel hardware tight for safety. Check wheel
hardware torque before operating, twice during first ten hours of
operation and thereafter every week/50 hours of operation. New engines are filled at the factory with John Deere Break-In Plus Engine Oil.
Do not add make-up oil until the oil level is BELOW the ADD
mark on dipstick. If make-up oil is required during the break-in period,
John Deere Engine Break-In Plus oil should be used whenever possible.
If the engine has too much operating time at idle, constant
speeds, and/or light load usage, or make-up oil is required during
the first 100-hour period, a longer break-in period may be needed
without changing Break-In Plus oil until 500 hours.
After a minimum of 100 hours and a maximum
of 500 hours of operation:
□
Replace Break-In
Plus Engine Oil.1
After first 100 hours of operation:
□
Tighten Air Intake System and Cooling System Hose Clamps
□
Inspect Tractor for Loose Hardware
|
Break-In
Plus is a trademark of Deere & Company
1 See Diesel
Engine Oil in Fuel, Lubricants and Coolant section for additional
information.
|
JZ81662,00010AA-19-20130702
|
|