Attach PTO-Driven Implement
-
CAUTION: Stop engine before attaching implement or working in
area of implement hitch.
Turn key off to stop engine.
-

M46416-UN-31JAN92
A - Drawbar
If PTO driven implement will be attached to drawbar (A),
the drawbar must be positioned so there is 355 mm (14 in.) between
end of PTO shaft and center of drawbar pin hole. Make sure drawbar
locking pins and spring pins are in place. If implement will be connected
to 3-Point Hitch, be sure drawbar will not interfere. Remove it if
necessary.
NOTE: There are two holes in the front of the drawbar. Place
the drawbar pin in the second hole for the proper 355 mm (14 in.)
length.
-
Attach implement to Tractor before connecting PTO drive line.
Raise hitch to upward position if it not to be used.
-
Rotate PTO shield upward for clearance. With engine off, turn
shaft slightly by hand if necessary to line up splines. Connect drive
line to PTO shaft. Pull out on shaft to be sure drive line is locked
to PTO shaft. Place PTO shield in downward position.
-
Be sure all shields are in place and in good condition. Never
operate PTO unless master shield is properly installed. WITH ENGINE
STOPPED, check integral shields on drive line by making sure they
rotate freely on shaft. Lubricate or repair as necessary.
-
Check carefully for any interference, make sure hitch is raised
to the upper position if it is not used.
|
|
PX07220,0000178-19-20160404
|
|