Inspect ROPS for Loose Hardware

CPA0002580-UN-16MAR16

P7644-UN-02APR01
A - ROPS Crossbar
B - Mounting Bolts (8 used)
|
Service Interval—
|
| |
Initial — 50 hours
|
| |
Regular — As required
|
CAUTION: Make certain all parts are installed correctly if roll
over protective structure (ROPS) is loosened or removed for any reason.
Tighten mounting bolts for proper torque. This protection
offered by ROPS is impaired, as in an overturn incident, or is in
anyway altered by welding, bending, drilling, or cutting. Do not reuse
damaged ROPS . Any alteration to the ROPS approved by manufacturer.
When installation of equipment on a machine needs loosening
or removing Roll-Over Protective Structure (ROPS) (A), mounting bolts
(B) tightened to following specifications
| Item | Measurement | Specification |
|
Mounting Bolts (M20) | Torque | 610 N·m (450 lb·ft) |
|
Mounting Bolts (M24) | Torque | 1050 N·m (775 lb·ft) |
Inspect ROPS mounting hardware every 250 operating hours for
proper torque or replacement.
|
|
PX07220,0000318-19-20160505
|
|