Clevis Drawbar

  1. RXA0161436
    RXA0161436-UN-09JAN18

    A - Pin

    B - Retainer

    C - Implement Pin

    Pull up and rotate retainer (B) to side.



  2. Pull up on pin (A) to remove implement pin (C).

  3. Align hook center of attaching rear implements in hitch opening.

  4. Install implement pin (C).

  5. Reinstall retainer (B) over implement pin.

  1. RXA0154069
    RXA0154069-UN-23SEP16

    A - Handle

    B - Retaining Pin

    C - Implement Pin

    Flip handle (A) to the vertical position as indicated.



  2. Rotate retaining pin (B) counterclockwise while pulling upward on the handle. Implement pin (C) releases when a notch in retaining pin aligns.

  3. Implement pin can be removed during connection or placed in the upper position. There are two detents on the implement pin shaft, one at the top and bottom. If the bottom detent of the implement pin is aligned with the retaining pin and locked, the pin is held up, allowing connection to the implement.

GS25068,0000AE1-19-20191118