Break-In Maintenance

After a minimum of 100 hours and a maximum of 500 hours of operation:

□  Replace Break-In™ Plus Engine Oil.

IMPORTANT: If make-up oil is required during the break-in period, John Deere Break-In™ Plus oil must be used whenever possible. New engines are filled at the factory with Break-In Plus engine oil.

Do not add make-up oil until the oil level is BELOW the ADD mark on dipstick. (See Fuel, Lubricant, and Coolants section.)

If any of the following occur during the first 100-hour period, it is advised to extend the break-in to 500 hours before changing the oil.

  • Too much operating time at idle.
  • Too much operating time at a constant speed.
  • Too much light load usage.
  • Make-up oil is required in the first 100 hours.

GS25068,0005ADF-19-20181010