Break-In Checks

IMPORTANT: Initial break-in maintenance interval of a new or rebuilt wet sleeve engine must last at least 100 hours with John Deere Break-In™ Plus oil. The surface mating of rings and liners usually occurs during the first 100 hours.

Maximum maintenance interval is the same as the maintenance interval recommended for your engine. (See Engine Oil and Filter Service Intervals in Fuels, Lubricants, and Coolants section.)

IMPORTANT: If engine oil must be added before first normal oil change, use John Deere Break-In Plus™ engine oil.

The engine is ready for normal operation. During first 100 hours of operation:

  • Operate engine at heavy loads without reaching sustained maximum load.
  • Avoid idling engine longer than 5 minutes. If engine idles longer than 5 minutes, stop engine.
  • Closely observe coolant temperature during operation.
  • Check air intake hoses and clamps. (See Air, Fuel, Coolant, and Exhaust Maintenance section.)
  • Check for fluid leaks.
  • Tighten wheel, wheel weight, and axle bolts after 3 HOURS, after 10 HOURS, and DAILY for the first week of operation. (See Wheels and Tires Maintenance section.)

Daily or Every 10 Hours

Perform normal daily maintenance:

  • Check engine oil. (See Engine Maintenance section.)
  • Clean dust unloading valve. (See Air, Fuel, Coolant, and Exhaust Maintenance section.)

For first 100 hours of machine operation, perform these additional maintenance daily or every 10 hours:

  • Drain water separator. (See Air, Fuel, Coolant, and Exhaust Maintenance section.)
  • Check coolant level. (See Air, Fuel, Coolant, and Exhaust Maintenance section.)
  • Lubricate hitch components. (See Hitch and Drawbar Maintenance section.)
  • Inspect tires for cuts or punctures. (See Wheels and Tires Maintenance section.)

GS25068,0005AE0-19-20181010