Lubricate Exchangeable 540/1000 rpm PTO Shaft
|
MAINTENANCE INTERVAL
|
| |
Annually
|

RXA0155648-UN-11NOV16

LV12604-UN-26APR05
A - Snap Ring
B - Stub Shaft
C - Bore
IMPORTANT: Ensure that PTO is stopped and allowed to cool before
servicing.
NOTE: When exchanging the PTO shaft, hydraulic oil does not
leak out due to a dry socket design.
-
Locate flattened area on the stub shaft which facilitates snap
ring removal and installation.
-
Align snap ring ends with flattened area. Remove snap ring (A)
and pull out PTO shaft (B).
-
Clean PTO shaft thoroughly and apply a light coat of grease.
Be sure the end bore (C) is clean if installing shaft for 1000 rpm
operation.
-
Turn PTO shaft end-for-end and insert in the PTO housing until
snap ring groove is visible.
-
540 rpm shaft—Rotate the shaft back
and forth while installing. Ensure that the shaft is properly seated
in housing; continue to push shaft in when installing snap ring.
-
1000 rpm shaft—Rotate the shaft back
and forth while installing until engagement is felt.
-
Install snap ring in the groove to retain PTO stub shaft. Align
ends of the snap ring with flat surface of shaft.
|
|
GS25068,0005B09-19-20181010
|
|