Changing Backhoe Bucket Position

The backhoe bucket can be positioned for "truck loading" (A) or "power digging" (B) by removing pin (C) and repositioning links (D).

1. Remove cotter pin and drive out pin.

2. Operate bucket cylinder until holes in links align with holes in bucket.

3. Install pin and cotter pin.


A-Truck Loading Position
B-Power Digging Position
C-Pin
D-Link

T107232
T107231

TX,35,BG712 -19-14FEB97-1/1