Preparing to Operate Loader After Operating Backhoe

T8196AP

1. Retract dipperstick and curl bucket.

2. Raise backhoe boom.

3. Center boom. Install boom lock and swing lock pins.

4. Raise stabilizers.

5. Turn seat to face front of machine.

6. Rollback loader bucket until bottom is parallel to the ground.

TX,35,RR2569 -19-15MAR94-1/1