Using Loader Bucket

NOTE: Bucket and boom can be positioned while machine is on-the-go.

1. Place bucket in dig position on ground.

2. Move gear shift lever to appropriate gear to dig. First or second gear is recommended.

3. Move forward into the material.

4. Raise and curl bucket to hold load.

T104830
T104831

TX,35,BG250 -19-29AUG97-1/1