Adjusting Boom and Bucket Linkage-Hands Only Machine
1.
Park machine.
2.
Lock boom in raised position.
3.
Remove center cover plate.
4.
Pivot each handle left and right. Ensure that boom control valve locks into detent.
5.
Confirm that when handles are returned to neutral position, they are in the center of opening range.
6.
If necessary, adjust positions of cables forward or backward using nuts (1) to properly position handles.
7.
Install center cover plate, and lower boom to ground.
|