Prepare for Assembly

  • Remove machine from the shipping crate:
    • Cut plastic tie straps fastening the back of the machine to the shipping crate.
    • Cut plastic tie straps fastening the front wheels to the shipping crate.
    • Cut plastic tie straps holding the discharge chute up.
    • Cut plastic tie straps securing the motion control levers to the machine.

IMPORTANT: Check all fluid levels before attempting to start the machine. Machine should be parked on a hard, level surface with the key switch in the STOP position.

BB87125,000149E-19-20130708